ASSESSMENT ON COMMISSIONING AND HAND OVER.

  • These are the last steps before practical completion. This is a critical stage, where the operator of the building must be involved, to ascertain a correct commissioning of all assets, understand the details of their capacities and have a thorough knowledge of every aspect of a building.


  • It is critical that the operator assesses and supervise the correct commissioning and handover before the landlord takes over and accepts responsibilities form what is built.


  • The FM can help identify non conformances from what was designed and built and will identify if the building is suitable for the intended use.


Please refer to case studies below:

​